Our services

Soup–to–nuts enclosure consulting services

Modern, high-performance enclosures are formidably complicated to design & construct. 

Our role is to help guide our architect & owner clients through that complexity to achieve facades that are stunningly beautiful, cost-effective, and high performing.  Our services span the gamut from scheme design to commissioning: 

Typical facade design & construction schedule juxtaposed against McClintock Facade Consulting services.

At each phase we deploy our collaborative, holistic methodology to create, analyze & help select facade options. 

Being involved throughout the process (and being solely focused on facades), allows us to provide the continuity needed to ensure the architect’s vision & the owner’s performance requirements are fully reflected in the built facade.

Details of our facade consulting services:

Click on the orange text for more information.

Early Design

Help set the facade system characterization on the right path early.  

Early Bid Package Documents

Sketches & narratives to ensure the package is clear & complete.  

Bid Assistance

Recommendation of sub-contractors based on technical bid reviews & bidders’ track records.  

Design Assist

Collaborate with the design & contractor teams to complete the facade design to meet aesthetic & performance requirements.  

Contract Documents

Review for barrier continuity (especially at interfaces), buildability & completeness.  

Submittal Review

Review of shop drawings & other submittals to confirm aesthetic & performance requirements are being met.  

Construction Administration

Witnessing testing & construction and troubleshooting failures to minimize owner & architect risk.  

Performance Modeling

Using experience, analysis & visualization of systems, components, & materials to facilitate informed design choices.  

Solar Control

Analysis, simulation & experience-based advice on solar control methods such as shading systems & glass coatings.  

Decarbonization

Facade performance optimization to reduce the carbon footprint on the path to net-zero energy buildings.  

Hand drawn sketch on crinkled paper of a facade collar detail & stabilizing cables for the Kookmin Bank HQ in Seoul.

CAD drawing of a facade collar detail & stabilizing cables for the Kookmin Bank HQ in Seoul.

A shop drawing blueprint of a facade collar detail & stabilizing cables for the Kookmin Bank HQ in Seoul.

Final rendering of the facade collar detail & stabilizing cables of the Kookmin Bank HQ in Seoul.

Facade Collar Development, Kookmin Bank HQ, Seoul